Pumping Systems
 

Pump control systems are designed...
To each client's individual requirements PLC SCADA ready or relay control to municipal standards.
 
PLC 'SCADA Ready' modern controls complete with ultra sonic or radar level monitoring or old fashioned relay control and all variations in between.
  • Across the line starters/soft start & stop/variable speed drives
  • Vandal proof alarm beacon/dialer/SCADA
  • Manual transfer switch & generator plug
  • Pump monitoring
  • Duplex/triplex stations
  • Elapsed time metering/event counting
  • 2 - 3 float system/ultra sonic or radar with float switch backup
  • Ventilation
  • Voltage/current measurement
  • Lighting and heating
  • Site tested and commissioned
  • Design only or full 'design build' coordinated service offered